Tuesday 10 February 2015

7. Walls & Ceiling continued.... Some of Amy's pics

9th February - Walls are almost done. 

 
12th February - following the curve of the roof was a bit of a challenge. The main steel ribs in the ceiling were spaced about 1500mm apart so I screwed on some plywood blocks to screw the lining to. I then used liquid nails and screwed on more ply blocks around 750mm in between each rib. the sharpest curve in the ceiling required me to cut part of the groove out of the lining board to allow for the angle on that row of boards.


Roughing in the electrical required some cutting into the steel frame of the bus.


Front section walls and ceiling mostly complete
The gap in the wall will be filled in with cement sheet and possibly stainless for behind the wood heater.


Rear section walls and ceiling mostly complete


Here are some photo's that my wife's sister took: